Current and Future Projects


Current Project Updates (PDF)

Summer 2018 Projects

Ruth S. Harley University Center

  • Full renovation of the University Center – lower level, ground floor, second and third Floor
  • New infrastructure including mechanical, electrical, plumbing and life safety systems with all systems brought to current code requirements
  • Food services relocated to lower level of building
  • Expanded footprint of the building on the lower level and ground floor
  • Included soft boundaries in landscaping concept to blend with adjacent open lawn space
  • Approximately 18,000 square feet of additional space
  • Extensive use of glass to allow more natural light into the building
  • Expansion of dining Services to 11,000 square feet from current 6,000 square feet
  • Outdoor amphitheater and plaza
  • Full service Starbucks
  • Additional multi-use meeting space for faculty and students
  • Expanded commuter lounge
  • Expanded art gallery
  • Spirit Shop and bookstore
  • Wellness center on the third floor
  • Gender neutral bathrooms in select areas
  • State of the art audio-visual systems throughout the building

Alumnae Hall

Relocate Archeology Lab from Blodgett Hall 102 to Alumnae Hall 219 and renovate new lab. Relocated space will be more convenient for faculty, students, staff to be in the same building as department offices. Dean of College of Arts and Sciences Leadership is reviewing future uses for Blodgett 102.


Swirbul Library

  • Creation of 3 new All-gender Accessible Restrooms on the main floor
  • Full renovation of the second floor restrooms
  • All spaces will be fully accessible and barrier-free

Linen Hall

Upgrades to the main entrance, lobby, lounge, and kitchen. The corridors will receive new flooring, lighting and paint. Major renovation to include full upgrades to brand standards, of all finishes in the building.


Classroom Updates

Each year the Facilities Department and IT Department work together to update and modernize classroom spaces across campus. Several classrooms with be updated this year with new furniture, finishes, and technology.

  • Earle Hall
    • Rooms 101, and 103 will be permanently separated by a wall to improve acoustic isolation of both rooms. Lighting and finishes will be updated. Additional electrical outlets will be added for device charging.
    • Room 108 will also be updated with fresh paint and additional electrical outlets for device charging.
  • Hagedorn Hall
    • Rooms 101, 220 will be updated with new furniture, finishes and technology as well as additional electrical outlets for device charging.
  • Social Work Building
    • Rooms 128, 306 will be updated with new furniture, finishes, and technology as well as additional electrical outlets for device charging.
    • Both rooms will be re-oriented to improve sight lines and cut the distance from the back of the room almost in half.
  • Addition technology upgrades are being done by the IT department.

Future Projects


Science Building

Redesign AV system and renovate lab 227.


Chapman Hall

Upgrades to the main entrance, lobby renovation, lounge, kitchen, and corridor. Renovation to include full upgrades to brand standards, all finishes, and systems in each building.


Earle Hall

Create a new laundry room to meet the demand of the student body. There will be upgrades to the main entrance, lobby, lounge, kitchen, and corridor. Major renovation to include full upgrades of all finishes, and systems in each building, ADA compliance.


Motamed Field

Roof, expansion joint, and turf replacement.

 

For further information, please contact:

Facilities Management
p – 516.877.3970
e – facilities@adelphi.edu

 
 